Bathrooms · Glasgow area

Bathroom installation

Bathroom installation

The challenge

A dated bathroom that needed stripping back to the walls before anything else.

The solution

The old suite came out, the room was re-tiled with a patterned feature band, and a new quadrant shower enclosure and sanitaryware were fitted and sealed.

Indicative programme

Typically around 2–4 weeks. Every job is priced and scheduled after we have seen it.

Compare before and after

The same room, after renovation
The same room, before renovation during strip-out
↔
During strip-outCompleted room

Demonstration photography, shown to illustrate the comparison slider. Golden Oak's own before-and-after shots drop straight into this panel.

Materials and key features

  • Full strip-out
  • Precision tiling
  • Quadrant shower enclosure
“The above company replaced my old flooring in my flat with a beautiful new hard wood flooring they also done the skirtings and door frames a top notch job”
Elaine Spence · Trustpilot

Related work

Free, no-obligation consultation

Planning something similar?

Send over what you are planning and we will come back to you with a free, no-obligation price.

CallWhatsAppFree quote