Decking & fencing · Glasgow area
Bespoke diamond decking

The challenge
An unused stretch of lawn with no usable, level outdoor seating space.
The solution
A raised frame was set out and boarded in a mitred diamond pattern with a contrasting border — cut and laid on site rather than bought in as a kit.
Indicative programme
Typically around 1–3 weeks. Every job is priced and scheduled after we have seen it.
Compare before and after


↔
During strip-outCompleted roomDemonstration photography, shown to illustrate the comparison slider. Golden Oak's own before-and-after shots drop straight into this panel.
Materials and key features
- Mitred diamond pattern
- Contrast border frame
- Built to specification
“The above company replaced my old flooring in my flat with a beautiful new hard wood flooring they also done the skirtings and door frames a top notch job”
Related work
Free, no-obligation consultation
Planning something similar?
Send over what you are planning and we will come back to you with a free, no-obligation price.